Renovation and Demolition Abatement in Lakewood, California

Typical cost in Lakewood

  • Kitchen or bathroom remodel, one or two materials$2,000 – $5,500+
  • Whole-house remodel or teardown, several materials$15,000 – $40,000+

A remodel and a teardown follow different paths under the district’s rule. We take care of the abatement side of both in Lakewood, Cerritos and Hawaiian Gardens, which means containment, removal and disposal of the asbestos the survey finds.

The permit comes from the City of Lakewood, and the asbestos notice goes to the district, so we treat them as two separate filings.

Request a free quote
Empty room with clear plastic sheeting over the walls and windows, a wood plank floor and a light blue-gray portable air machine with a flexible hose.

What we clear before the work

Remodels

Kitchen, bath and flooring remodels open up walls, floors and ceilings, which makes them renovation jobs. The survey comes first, and the notice follows when the job passes the small-job line.

Taking out a wall

A bearing wall coming out is demolition in the rule’s sense, which covers taking out any structural member that carries load, even when the rest of the house is only being remodeled.

Whole-house teardowns

Teardowns need the district notice every time, whatever the survey turns up, and no small-job exemption applies to demolition.

Apartments and commercial buildings

Apartment and commercial buildings are inside the rule too, because it covers any institutional, commercial, public, industrial or residential structure. Single-unit survey relief never reaches apartment buildings, townhouses or condominiums.

Permits and the district notice

Two offices handle two different pieces of a Lakewood project, and each one has its own deadline and its own paperwork.

The permit counter

Since November 1, 2025, applications made within the City of Lakewood have gone directly to the City of Lakewood. A demolition permit application also needs a copy of the district demolition notification for the local building and safety office, which state law requires according to the district.

The district notice

Under Rule 1403, the abatement contractor files the notification online with the South Coast Air Quality Management District, no later than 10 working days before the work starts. Until the required fee is included, the notification is not considered received.

Checking a contractor

Before work of 100 square feet or more of asbestos-containing material starts, look at two credentials. Cal/OSHA registration belongs to the employer. The Contractors State License Board license should list a C-22 Asbestos Abatement classification, or show that the qualifier passed the asbestos certification exam.

Room with clear plastic sheeting hanging from the ceiling and walls and draped over a dusty wood floor, with an orange machine near the far window.

Teardown plans start with asbestos testing, and the home page lists the rest.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (562) 303-5293

Call (562) 303-5293