Ceiling and floor materials removed before a kitchen remodel permit is filed
Example project
- Home
- 1950s tract house in Lakewood with a textured kitchen ceiling and vinyl over the original floor
- Original request
- Remodel the kitchen with new cabinets, a new floor and a smooth ceiling
- Testing
- A Cal/OSHA-certified asbestos consultant samples the ceiling texture, the vinyl, the mastic and the wall compound
- Found
- Asbestos in the ceiling texture and the mastic under the vinyl
- Clear
- The vinyl itself and the wall compound
- Area
- About 120 sq ft of ceiling and 130 sq ft of floor
- Timeline
- Notice no later than 10 working days ahead, then three working days
- Cost
- $4,200
Scope of work
Samples of each material, the district notice, the kitchen sealed with air filters running, the ceiling texture and the floor layers removed wet, bagging and the haul. The clearance air test, the permit and the remodel itself are separate.
Project overview
In this example, a family in Lakewood is remodeling the kitchen of a 1950s tract house. Building permit applications in the city now go straight to the City of Lakewood, and the asbestos notice goes to the district, a separate office with its own deadline.
The ceiling texture and the mastic test positive. The abatement crew clears both before the cabinet crew starts, and the permit work and the notice move along side by side.
The goal
The goal is a kitchen with the positive ceiling and floor materials gone, so the permitted work starts on clean surfaces.
Process
- First visit A Cal/OSHA-certified asbestos consultant samples every surface the remodel disturbs.
- Before work The contractor files the district notice online while the owners file the permit application with the city.
- Days one to three The kitchen is sealed, the ceiling texture comes down wet and the floor layers are lifted.
- Last An independent consultant tests the air, then the cabinet crew starts.
Planning right
- Give the city the plans, and the district the notice, as two separate filings.
- Keep the lab report with both sets of papers.
- Order cabinets for after the air results.
- Set up a coffee corner away from the kitchen.
Get a free quoteMore about renovation and demolition abatement