Samples for a remodel
The first question on a remodel is where the work lands. Samples follow it, so floors are sampled layer by layer to the joist level and cavities in walls and ceilings are sampled as far as it takes to identify the material.
Typical cost in Lakewood
In Lakewood, California, the South Coast Air Quality Management District requires the affected building or its components to be thoroughly surveyed for asbestos prior to any demolition or renovation, apart from a small single-unit house renovation. We set up that survey so you have a written result before the work starts.
Samples are taken by a certified asbestos consultant or technician, certified through Cal/OSHA and trained as an EPA Building Inspector. We never certify a house ourselves, and we ask that you leave sampling to them.

The first question on a remodel is where the work lands. Samples follow it, so floors are sampled layer by layer to the joist level and cavities in walls and ceilings are sampled as far as it takes to identify the material.
Before a teardown, both the survey and the district notice are required, whatever the lab finds. Removing a load-supporting wall is demolition under the rule, so a remodel that takes one out needs the district notice too.
Each sample appears in the report with its location and the lab finding. Your removal crew plans the job from that record.
The rule sets no building age below which the survey is skipped. A newer house, a later addition or a commercial building is surveyed before demolition or renovation like any other.
Three points decide how a survey is done and what its result means for your project.
In California, asbestos consulting is a certified trade. Only a Cal/OSHA-Certified Asbestos Consultant can provide it, and sampling, or planning and overseeing removal of 100 square feet or more of asbestos-containing material, calls for certified consultants and technicians. Our removal crew follows the tester’s report and does not certify a house itself.
Cal/OSHA’s line sits at more than 1/10th of 1% asbestos by weight for asbestos-containing construction material. The district’s floor covering definition and the state waste table sit higher, at 1 percent. A lab figure can meet one line and not the other, which is why your report lists percentages for each material.
The survey break for small renovations covers single-unit dwellings with less than 100 square feet of asbestos-containing material taken out or stripped, and it stops there. Apartments, townhouses, condos and every demolition stay under the survey rule. Testing is what tells you how much material there is.
Once you have results, see floor tile and mastic removal or the home page.
We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.
Call (562) 303-5293