Asbestos Removal in Cerritos

Asbestos testing and removal in Cerritos covers everything from ceiling texture and floor tile to duct wrap, plaster and complete demolitions. Before demolition or renovation the district’s rule requires a survey, except for a single-unit house renovation under 100 square feet, and our work begins there.

More than 8 in every 10 homes in Cerritos were built before 1980, and half of Cerritos’s homes were built in or before 1974. The survey comes before the work whatever the year, since the rule sets no build-year cutoff.

Request a free quote
Empty living room with a textured ceiling, plain white walls, beige carpet, a sliding glass door with curtains and a doorway leading to a hall.

How we can help

Testing first

A Cerritos project begins with asbestos testing, with a certified tester sampling the materials your work will touch. What the lab report shows decides what has to come out, and the plan follows from that.

Ceilings

Nobody scrapes or sands a Cerritos textured ceiling before it is sampled. Removal happens only when the result calls for it, and popcorn ceiling removal has the details.

Floors

Cerritos floors with a positive sample, glue included, go to floor tile and mastic removal, after every layer down to the joist level has been sampled.

Walls

Before a Cerritos wall or ceiling is opened, its plaster, drywall and joint compound go to the lab. The survey also reaches into the cavities behind them as far as needed, and if one tests positive, drywall, joint compound and plaster removal takes over.

Heating and attic insulation

Putting in or taking out heating and cooling equipment is renovation work to the district, so a furnace or air handler job begins with the survey, unless it is a single-unit house job removing less than 100 square feet of asbestos-containing material. Wrapped ducts and insulated pipes near the equipment go to a lab, and a positive result means HVAC duct and pipe insulation removal.

Cerritos housing

Here are the housing figures for Cerritos, followed by what they mean for a survey before demolition or renovation.

Homes from the 1970s

The 1970s produced more than 5 in every 10 homes in Cerritos, while only about 5 in every 100 predate 1960. Newer homes and later additions are surveyed like any other.

Houses and larger buildings

Cerritos has about 88 one-unit homes in every 100 and about 7 in every 100 in buildings of five or more units. For those larger buildings and any condo or townhouse, the single-unit survey carve-out does not apply, because the district’s rule does not call them residential single-unit dwellings.

Permits in Cerritos

Cerritos has asbestos wording on its own demolition paperwork, and the district notice still goes to the district itself.

The demolition application

The City of Cerritos demolition application asks that the South Coast Air Quality Management District be notified of demolition and any asbestos removal, and the permit form carries an asbestos declaration.

The district notice

For a demolition, or a renovation removing 100 square feet or more of asbestos-containing material, notice goes to the district no later than 10 working days ahead of the work, with the district notification fee, and we file it online. Separately, state law, as the district describes it, sends a copy of a demolition notification to the local building and safety office when the demolition permit is requested.

Garage with painted block walls, a utility sink at the left with a patch of patterned vinyl floor tile beside it, bare concrete elsewhere and a white cabinet at the right.

Frequently asked questions

Does a Cerritos demolition need the district notice?

A demolition always does, found asbestos or not. The rule has the district hear about every planned demolition, and about any renovation that removes 100 square feet or more of asbestos-containing material. The Cerritos demolition application asks for notice of demolition and any asbestos removal. We file the notice no later than 10 working days before the work.

Who files the notice?

We take care of it. The abatement contractor files the notification with South Coast AQMD electronically, together with the district notification fee, because the district counts a notification as received only with the fee.

Do I need a survey before a remodel?

The survey requirement covers remodels as well as teardowns, as it comes before any demolition or renovation. A single-unit dwelling renovation that takes out less than 100 square feet of asbestos-containing material is excused, and testing tells you the amount.

Who takes the samples?

Certified people take the samples, meaning an asbestos consultant or technician with Cal/OSHA certification and EPA Building Inspector training. If a material in your Cerritos house looks suspect, call us first and leave it as it is.

See asbestos removal in Hawaiian Gardens or the home page.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (562) 303-5293

Call (562) 303-5293